Skip to main content

January 29, 2019

inside pics 1.29.19  (4).JPG  inside pics 1.29.19  (9).JPG

Installation of PVC window trim and molding continues. With the completion of the window trim, the siding and brickwork can begin. Plywood backing is currently being installed. The sheetrock and ceilings will be added in the next few weeks.